Projected Timeline

Table 1: Rotary-engine air compressor development and manufacturing project timeline.

Week
Task
1
2
3
4
5
6
7
8
9
10
Literature study
x
x
x
CAD modeling
x
x
x
x
x
Simulation of models and preliminary optimization

x
x
Producing and assembling of the prototype

x
x
x
Prototype testing and producing the final deliverable
x
x
x
Final report preparation
x
x
x


Weekly progress goals-completed/failed/ongoing:
          -Group meets weekly to discuss progress and any upcoming/ongoing/recently finished tasks and any problems/improvements possible.

Week 1:
     Form group & brainstorm project ideas-completed
     Research background of project-completed

Week 2:
     Finalize project idea-completed-Wankel Engine Air Compressor
     Further research into workings, components, manufacturing techniques involved-completed
     Finish Project Proposal-completed
     Begin CAD modeling-Prototype 1 completed

Week 3:
     CAD modeling continues-Prototype 2 completed, design revisions needed to complete housing and design details
     Discuss and finalize manufacturing techniques for each piece-completed

Week 4:
     Parts list finalized-completed
     Begin ordering parts-completed
     Create Project Proposal Presentation PowerPoint-completed
     Final CAD model delivered-completed

Week 5:
     Finalize prototype design if not already finished-completed
     Computer-Aided Simulations and Analysis begins-completed
     Begin manufacturing prototype-completed-main housing printed, manufacturing plans finalized for other parts

Week 6:
     Continue manufacturing prototype (3D printing, machining, etc.)-completed-prototype crankshaft machined, rubber gasket cut to                  shape, prototype lid laser cut
     Computer-Aided Simulations and Analysis continues-completed
     Finish Simulations and Analysis on prototype along with final revisions to design-static simulations completed
     Begin work on final report-completed

Week 7:
     Finish manufacturing and assembly of prototype-completed
     Begin physical analysis on any parts already manufactured-completed
     If necessary, manufacture revised parts for final assembly-completed
     Continue work on final report, draft due-completed
     Prototype deliverable due-completed

Week 8:
     Finish analysis and testing of physical prototype-completed
     Continue manufacturing of final components of final assembly-completed
     Continue work on final report-completed-rough draft submitted
     Begin work on final presentation-completed-rough draft submitted

Week 9:
     Finish manufacturing of final deliverable-completed
     Finished final report-completed
     Final report due-completed-submitted
     Continue work on final presentation-ONGOING
     Poster created and submitted for freshman design competition-ONGOING

Week 10:
     Final presentation due-
     Final deliverable due-